紫外線下水道ライニング紫外治癒プロセストレンチレスの水線修理都市DN740
価格: Variable
MOQ: 90m
納期: 15 working days
ブランド: DAO
ハイライト:DN740 uv sewer linings Urban, DN740 trenchless water lines repair, uv sewer lining Urban DN740
CIPP UV construction for urban pipeline repair via trenchless renovation UV curing repair material selection: The structure of all imported glass fiber + resin used for UV curing is divided from outside to inside: UV protective film, outer film, glass fiber fabric, and inner film (dragged out after ... もっと見る
➤ 訪問 Webサイト
小さく軽い列車CIPP紫外線治癒システム従来の高圧水星DN200-600
価格: Variable
MOQ: 1 set
納期: 15 working days
ブランド: DAO
ハイライト:lights train CIPP UV curing DN200-600, DAO CIPP UV curing system, DN200-600 uv cure systems
Small light train for CIPP UV cure system by traditional high voltage mercury Mercury light to cure underground sewers is a very traditional technology in the market. Usually, this is made in Germany. DAO brand UV CIPP cure by mercury light is developed and produced by Daoyunai Energy Saving Technol... もっと見る
➤ 訪問 Webサイト
コーティングの下水道内部修理下水道はさみ金CIPPを並べる紫外線管は発掘を処理しない
価格: Variable
MOQ: 10m
納期: 15 working days
ブランド: DAO
ハイライト:uv lining processing DAO, DAO uv pipes coating, DAO uv linings process
UV light curing inner repair sewer liner by CIPP process no need digging The UV light curing inner repair liner (hereinafter referred to as the liner) comprises the inner membrane, resin-impregnated glass fiber, outer membrane, and ultraviolet protective film from the inside to the outside. 1-Protec... もっと見る
➤ 訪問 Webサイト
プラスチック地下のパイプラインのリハビリテーションを並べる紫外紫外線治された管
価格: Variable
MOQ: 50m
納期: 15 working days
ブランド: DAO
ハイライト:DAO ultraviolet uv cured pipes lining, DAO plastic UV Cured linings, ultraviolet curing process
Necessary product for underground pipeline repair construction work of CIPP UV 1. the repaired pipeline structure meets or exceeds the strength, stability, and deformation requirements 2. after repair, the pipeline is smooth and meets the requirements of flow capacity 3. the service life of the repa... もっと見る
➤ 訪問 Webサイト
CIPPは国際的な都市が掘ることなしの修理を配管する治された設置されている管プロセスのライニングをぬらす
価格: Variable
MOQ: 70m
納期: 10 working days
ブランド: DAO
ハイライト:cipp cured in place pipe process, cured in place pipe lining process, cipp wet out process
Construction material used for international city pipes repair w/o digging The UV curing overall repair lining material is made of unsaturated polyester resin, which has the characteristics of convenient curing, strong adhesion, and low shrinkage. The lining material is made of high-strength glass f... もっと見る
➤ 訪問 Webサイト
CIPPの点のライニング修理は紫外線の治癒機械を並べ直す設置されている管を治した
価格: Variable
MOQ: 30 m
納期: 16 working days
ブランド: DAO
ハイライト:cipp spot repair DAO, cipp spot lining cured in place, relining uv light curing machine
UV lining materials for trenchless curing sewers in the municipal department Classification: The second type is divided into local repair and overall repair according to the repair length. Local repair refers to the repair of short-distance pipes, generally with a longitudinal length of less than 50... もっと見る
➤ 訪問 Webサイト
治された設置されている紫外線CIPPの装置のインストールの小さい直径の下水道は非発掘を修理した
価格: Variable
MOQ: 1 unit
納期: 20 working days
ブランド: DAO
ハイライト:DAO cured in place UV CIPP Equipments, DAO UV CIPP Equipment installations, DAO UV CIPP installation equipments
Small diameter sewer repaired by CIPP UV cure product trenchless No-Dig DAO UV cure system is in Integrated design, High integration!!! It is manufactured to repair underground small sewers, ranging from DN200 up to DN600. Those features High efficiency and energy-saving, little pollution, and only ... もっと見る
➤ 訪問 Webサイト
高画質カメラ CCTVパイプクローラー 130mケーブル長さ 耐久性
価格: variable
MOQ: 1
納期: 1-2 weeks
ブランド: Daoyunai
Product Description: CCTV Pipe Crawler CCTV Pipe Crawler is a cutting-edge sewer inspection device that is designed to inspect sewer pipes up to 130m in length. It is made of high-quality stainless steel and is equipped with a wireless remote control for ease of operation. With its lightweight of 12... もっと見る
➤ 訪問 Webサイト
D919紫外線CIPPの装置CIPPは設置されている管のライニング装置ライト棚の引きロープを治した
価格: Variable
MOQ: 100m
納期: 10 working days
ブランド: DAO
ハイライト:CIPP UV D919, D919 CIPP UV Equipments, CIPP UV Equipments D919
The UV CIPP cure system light rack pulling the rope of high-temperature resistance The reserved rope and the pull light rope shall be connected with a dead buckle to ensure that they will not fall off accidentally, and the nodes shall be wrapped with adhesive tape, especially the rope head of the pu... もっと見る
➤ 訪問 Webサイト
水道管の地方自治体の下水道修理DN200-1650を並べる紫外線CIPPを並べ直す発掘無し
価格: Variable
MOQ: 30m
納期: 15 workding days
ブランド: DAO
ハイライト:DN200-1650 cipp water mains linings, DN200-1650 Relinings CIPP Uv Linings, CIPP Uv Lining Water Mains DN200 1650
CIPP-UV material for municipal sewers repair DN200-1650 by NO-DIG DAO CIPP-UV cure material is designed for underground municipal sewer trenchless repair using Cured-in-Place-Pipe technology. It is good to use the newly developed LED cure system or the traditional voltage Mercury light cure system, ... もっと見る
➤ 訪問 Webサイト
CIPPの紫外線治癒プロセス インストール・プログラムの地下の空間管理プログラム材料
価格: Variable
MOQ: 27 m
納期: 15 working days
ブランド: DAO
ハイライト:cipp uv curing process DAO, cipp uv curing installation DAO, cipp uv process DAO
Materials for CIPP installation program in underground space management Necessary tools for UV CIPP cure trenchless operation 1. One winch with a capacity of more than 3 tons, including a steel wire rope of more than 150m (depending on the length of the repaired pipe). It is best to adjust the speed... もっと見る
➤ 訪問 Webサイト
cippの技術の掘削はさみ金を非並べる安全によって治される設置されている下水道
価格: Variable
MOQ: 60m
納期: 18 working days
ブランド: DAO
ハイライト:cured-in-place pipe cipp technologys DAO, cured-in-place pipe safety, cured-in-place sewer pipe lining
The non-excavation liner of high strength and quality for UV trenchless curing sewers Classification: The first method is preventive repair and salvage repair according to the priority of repair time. Preventive repair: a city needs to reasonably plan and manage the underground pipelines and these f... もっと見る
➤ 訪問 Webサイト
修理トレンチレスの器具レンタルサービス紫外線治療システムCCTV
価格: Variable
MOQ: 1 unit
納期: 10 working days
ブランド: DAO
ハイライト:Trenchless Equipment Rental services, DAO trenchless repairs equipment, trenchless equipment services
Rental services for trenchless repair equipment UV cure system and CCTV Daoyunai Energy Saving Technology Co., Ltd. provides UV light curing equipment and CCTV leasing services for customers with limited budgets and customers who have just joined the trenchless repair industry in the early stage, so... もっと見る
➤ 訪問 Webサイト
DN400 耐久性のあるUV固化溝のない下水道修復ソリューション
価格: Variable
MOQ: 10 meters
納期: 1-2 weeks
ブランド: Dao
ハイライト:Trenchless Sewer Repair Solutions, UV Curing Trenchless Sewer Repair, DN400 Trenchless Sewer Repair
Product Description: Trenchless Sewer Repair represents a groundbreaking advancement in the maintenance and rehabilitation of sewer systems. This innovative product utilizes state-of-the-art sewer relining technology, allowing for the restoration of pipes without the need for disruptive and costly e... もっと見る
➤ 訪問 Webサイト
Prominent Manufacturer In Fiberglass Tailored For Industrial Applications
価格: USD2.5 per kg
MOQ: 1kg
納期: 5-8 working days
ブランド: Dao
Prominent manufacturer in fiberglass tailored for industrial applications Daoyunai is a prominent manufacturer specializing in producing fiberglass tailored for diverse industrial applications. With a commitment to quality and innovation, Daoyunai's fiberglass products are integral components in var... もっと見る
➤ 訪問 Webサイト
都市・農村間の下水管を並べる治療紫外線CIPPは治された設置されている管のライニング プロセスを修理する
価格: Variable
MOQ: 50m
納期: 15 working days
ブランド: DAO
ハイライト:DAO cure uv CIPP Linings, CIPP Cured In Place Pipes Lining Process, cured in place pipe process
UV-CIPP materials for urban and rural sewer networks repair by No excavation Basic principles The CIPP curing method is known in English as cured-in-place pipe. Its principle is to form a complete and new pipeline with structural strength inside the existing pipeline through a certain process. UV-CI... もっと見る
➤ 訪問 Webサイト
Pipe Test Plug for Sewer Tightness Testing from DN100-DN1000 of High Pressure
価格: Variable
MOQ: 1 piece
納期: 5-10 working days
ブランド: DAO
Pipe Test Plug for Sewer Tightness Testing from DN100-DN1000 of High Pressure Sewer tightness testing plugs are crucial components in assessing the integrity of sewer lines. These plugs are used to temporarily seal off specific sections of a sewer line during testing. This allows for focused pressur... もっと見る
➤ 訪問 Webサイト
紫外紫外線CIPP装置の地下の下水道のパイプライン修理下水管
価格: Variable
MOQ: 1 unit
納期: 25 working days
ブランド: DAO
ハイライト:DAO Ultraviolet uv cipp equipments, DAO ultraviolet curings, ultraviolet curings DAO
UV cure CIPP equipment specially designed to repair underground sewer pipeline UV Cure Equipment features: 1. 15-inch touch control screen: the real-time display of curing speed and distance, monitoring of temperature and pressure changes, construction In the process, it is necessary to touch and ad... もっと見る
➤ 訪問 Webサイト
多機能ガラス繊維マットの原産メーカー 量別注文
価格: Variable
MOQ: 1 kg
納期: 5-10 working days
ブランド: DAO
ハイライト:uv pipe lining, Fiberglass UV CIPP Lining, Weft reinforcement UV CIPP Lining
Original manufacturer of multifunctional glass fiber mat order by weight Fiberglass mat production involves the manufacturing of a non-woven fabric made from fine glass fibers. These fiberglass fibers are randomly oriented and bonded together using a binder material. The production process typically... もっと見る
➤ 訪問 Webサイト
0.1-4m/min 固化速度 UV CIPP 装置 200m/60-130\U2103 水銀電球システム
価格: Variable
MOQ: 1
納期: 2 weeks
ブランド: Daoyunai
ハイライト:UV CIPP Pipe Lining Systems, Cipp Uv Curing Equipment, CIPP UV liner equipment
Product Description: The UltraViolet CIPP Equipment is a heavy-duty machine, weighing 550kg, which makes it sturdy and durable. It has a curing length of 200m, making it suitable for repairing long pipelines. The equipment operates at a curing temperature of 60-130℃, which ensures that the resin cur... もっと見る
➤ 訪問 Webサイト