中国の工場
>
...
>
鋼管の棚
(32)アルミニウム管から成っていた仕事台PEは管、ステンレス鋼の管、等に塗った。
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:industrial shelving units, pipe storage rack
Workbench Made Of Aluminum Tubes, PE Coated Tubes, Stainless Steel Tubes, Etc. Quick Detail: We manufacture and supply high-grade eco-pipes for uses in various industrial applications. These corrosion resistant pipes have been designed using the latest technology and deliver flawless performance wit... もっと見る
➤ 訪問 Webサイト
倉庫の貯蔵プラスチック上塗を施してある鋼管が付いている適用範囲が広く頑丈なパレット棚
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管の貯蔵の棚
Quick Detail: 1. Materials: ABS coated steel pipe,2.5mm thickness balck pipe joints, flexible pipe in 1.5mm thickness.Roller Track and roller Track support. 2. Modular design product, be assembled by pipe joints and fixed M6*25 bolts and nuts, without welding.Simple and easy operation. 3. Can be adj... もっと見る
➤ 訪問 Webサイト
倉庫の 1.7MM のアルミ合金の管が付いている縦の鋼管のラッキング システム
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管のラッキング システム
Quick Detail: 1. Materials: 1.7 MM aluminum alloy pipe,aluminum pipe connectors,roller track ,roller track support and caster wheels. 2. Aluminium pipe rack system, be connected by aluminum pipe and pipe joints and fixed M6*20 bolts and nuts, without welding. With caster wheel can move free. 3. Can ... もっと見る
➤ 訪問 Webサイト
黒いプラスチックは鋼管の棚/産業棚付けの先入れ先出し法の流れのラッキング システムに塗りました
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管の貯蔵の棚
Quick Detail: 1. Materials:Black plastic coated steel pipe, balck pipe joints lean pipe in 1.2mm thickness.Roller Track and roller Track support. 2. Has the anti-static function, suitable for electronic equipment production workshop. Modular product, be connected by pipe joints and fixed M6*25 bolts... もっと見る
➤ 訪問 Webサイト
共同システム鋼管の棚 CAD のデッサン モデル産業棚付けの単位
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管の貯蔵の棚
Pipe and Joint System CAD Drawing Model for Assemble Steel Pipe Racking Quick Detail: Pipe Racking sysytem is assemble by plastic coated pipe and pipe joints system . If you want to finished pipe rack products . Firstly ,tell us your require, about size and shape . Second, we will design and draw fo... もっと見る
➤ 訪問 Webサイト
細い管は鋼管の棚を組み立てます
価格: Negotiation
MOQ: 2PCS
納期: Within 7 working days after received deposit.
ブランド: TOP-KING
ハイライト:産業棚付けの単位, 管のラッキング システム
Flexible for Industry Application Material: Materials: 0.8mm,1.0mm,1.2mm,1.5mm and 2.0mm plastic coated pipe Color: Pipe:Beige,white,yellow,black(ESD);Metal joints:Black and silvery Size OEM&ODM service,the size according to your require. Capacity 100-200 kg (Different thickness of pipe and diff... もっと見る
➤ 訪問 Webサイト
電子倉庫のための頑丈な鋼管のラッキング システム貯蔵のPEの管の棚
価格: Negotiation
MOQ: 5 PCS
納期: Within 10 working days after received deposit.
ブランド: Top-King
ハイライト:JJ20190809鋼管の悩ますシステム, 頑丈な鋼管のラッキング システム, 2.5mmの厚さの産業棚に置く単位
storage rack PE pipe shelves Heavy Duty Steel Pipe Rack Racking System for warehouse Electronic Industrial Name Storage rack Color black/white/ivory/beige/other Material ABS coated steel pipe,2.5mm thickness balck pipe joints, flexible pipe in 1.5mm thickness.Roller Track and roller Track support. F... もっと見る
➤ 訪問 Webサイト
ステンレス鋼の管棚の注文の構造容易電子機器のために集まっています
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管の貯蔵の棚
Stainless steel pipe rack Custom Structural Steel Storage Pipe Rack For Electronic Equipment Quick Detail: 1. Material: 1.0 mm thick stainless steel pipe, metal joint, 85 mm wide drum track and roller track support 2. Storage pipe rack for electronic equipment products, assembly of plastic coated pi... もっと見る
➤ 訪問 Webサイト
電子産業の、縦の管ラッキング システムの頑丈な鋼管の棚
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管のラッキング システム
Quick Detail: 1. Materials: ABS coated steel pipe,2.5mm thickness balck pipe joints, flexible pipe in 1.5mm thickness.Roller Track and roller Track support. 2. Modular design product, be assembled by pipe joints and fixed M6*25 bolts and nuts, without welding.Simple and easy operation. 3. Can be adj... もっと見る
➤ 訪問 Webサイト
産業貯蔵のための環境に優しく適用範囲が広い倉庫の貯蔵の棚付け
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管の貯蔵の棚
Quick Detail: 1. Materials: Assembled by plastic coated pipes, roller track, placon support and pipe joints. 2. Modular product, be connected by pipe joints and fixed M6*25 bolts and nuts, without welding. 3. Can be adjusted the size to meet your need. 4. We accept custom order, OEM & ODM 5. Eas... もっと見る
➤ 訪問 Webサイト
頑丈な鋼管の貯蔵の棚
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管の貯蔵の棚
Plastic Coated Steel Pipe Rack Heavy Duty Storage Shelving Units Quick Detail: 1. Materials: Beige plastic coated steel pipe, balck pipe joints .PE coated pipe in 1.2mm thickness. 2. Modular product, be connected by pipe joints and fixed M6*25 bolts and nuts, without welding. 3. Can be adjusted the ... もっと見る
➤ 訪問 Webサイト
調節可能な 1.2mm の厚さの管が付いているモジュラー食糧貯蔵の鋼管の棚
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管の貯蔵の棚
Quick Detail: 1. Materials:Beige plastic coated steel pipe, balck pipe joints .PE coated pipe in 1.2mm thickness.Roller Track and roller Track support. 2. Modular product, be connected by pipe joints and fixed M6*25 bolts and nuts, without welding. The flow top leve are suitable for storage the good... もっと見る
➤ 訪問 Webサイト
PE の上塗を施してあるモジュラー鋼管の棚
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管のラッキング システム
Storage Steel Pipe Pack System,Steel Structure Pipe Rack Movable Pipe Rack Quick Detail: 1. Materials:PE coated steel pipe, balck pipe joints lean pipe in 1.0mm thickness.Roller Track and roller Track support.and the caster wheel. 2. Modular product, be connected by pipe joints and fixed M6*25 bolts... もっと見る
➤ 訪問 Webサイト
適用範囲が広い光沢のある鋼鉄モジュラー管棚 5 層の金属の棚付けの流れのタイプ
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:管の貯蔵の棚, 管のラッキング システム
Quick Detail: 1. Materials: PE coated steel pipe, balck pipe joints lean pipe in 1.0mm thickness. Roller Track and roller Track support.and the caster wheel. 2. Modular product, be connected by pipe joints and fixed M6*25 bolts and nuts, without welding.With caster wheel can move free. 3. Can be adj... もっと見る
➤ 訪問 Webサイト
アルミニウム管および管接合箇所による産業 2 つの層の足車の鋼管の棚
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:industrial shelving units, pipe racking system
Industrial 2 Tier Caster Steel Pipe Rack By Aluminum Pipe And Pipe Joints Quick Detail: 1. Materials: 1.7 MM aluminum alloy pipe,aluminum pipe connectors,roller track ,roller track support and caster wheels. 2. Aluminium pipe rack system, be connected by aluminum pipe and pipe joints and fixed M6*20... もっと見る
➤ 訪問 Webサイト
調節可能なアルミニウムは鋼管の貯蔵の棚手トラックのトロリー ODM/OEM を集めます
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:管の貯蔵の棚, 管のラッキング システム
Quick Detail: 1. Materials: 1.7 MM aluminum alloy pipe,aluminum pipe connectors,roller track ,roller track support and caster wheels. 2. Aluminium pipe rack trolley system, be connected by aluminum pipe and pipe joints and fixed M6*20 bolts and nuts, without welding.With caster wheel can move free. ... もっと見る
➤ 訪問 Webサイト
細いプラスチック上塗を施してある鋼管の貯蔵の棚システム 1.5mm 厚さの適用範囲が広い管
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:industrial shelving units, pipe storage rack
Lean Plastic Coated Steel Pipe Storage Rack System 1.5mm Thickness Flexible Pipe Quick Detail: 1. Materials: Lean plastic coated steel pipe, balck pipe joints flexible pipe in 1.5mm thickness.Roller Track and roller Track support. 2. Modular design product, be assembled by pipe joints and fixed M6*2... もっと見る
➤ 訪問 Webサイト
クロムはステンレス鋼の管棚 5 層、28mm Dia/1mm の厚さをめっきしました
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:industrial shelving units, pipe racking system
Chrome Plated Pipe Rack Joints Connecting Stainless Steel Pipe Rack With Bolts & Nuts. Quick Detail: 1. Materials: 28mm diameter and 1.0 mm thickness stainless steel pipe,2.5mm thickness chrome plated pipe joints,40 mm aluminum frame Roller Track and roller Track support. 2. Modular design produ... もっと見る
➤ 訪問 Webサイト
貯蔵のモジュラー PE の上塗を施してある鋼管の棚、ローラー トラック管ラッキング システム
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:pipe storage rack, pipe racking system
Storage Modular PE Coated Steel Pipe Rack , Roller Track Pipe Racking System Quick Detail: 1. Materials: PE coated steel pipe,2.5mm thickness black pipe connectors, plastic coated pipe in 1.0mm and 1.5mm thickness.Roller Track and roller Track support. 2. Modular steel pipe rack design product, be a... もっと見る
➤ 訪問 Webサイト
黒い管のコネクターが付いている頑丈な倉庫のプラットホームの管 RackTrolley
価格: Negotiation
MOQ: 5 PCS
納期: Within 7 working days after received deposit.
ブランド: Top-King
ハイライト:産業棚付けの単位, 管の貯蔵の棚
Quick Detail: 1. Materials: Beige plastic coated steel pipe,2.5mm thickness black pipe connectors, plastic coated pipe in 1.0mm and 0.8 mm thickness.Top plate caster wheel. 2. Modular steel pipe rack design product, be assembled by pipe connectors and fixed M6*25 bolts and nuts, can be structured di... もっと見る
➤ 訪問 Webサイト